IMMEDIATE ACTION REQUIRED
Identification and Implementation of Operational Restrictions
If there is any uncertainty over the locations of ABB FSKII Circuit Breakers, or the best available option to implement this advice for a particular scenario, contact your Regional or Route (E&P) Engineering team.
Implementation of Emergency Switch-Offs
Where an ABB FSKII Circuit Breaker is being used to effect an Emergency Switch-Off, a second open point shall be created in series with the FSKII breaker before confirming that the ESO has been taken.
Where available, the second open point should be a motorised air-break disconnector (e.g. Busbar disconnector), but otherwise may be the TNO/DNO Circuit Breaker, Feeder circuit breaker, bus coupler, set of track feed circuit breakers or overhead line switches and may be another FSKII circuit breaker.
Implementation of Overhead Line Isolations
Where practicable, the same principle of creating a second open point should be applied to overhead line isolations.
Where such facilities are not practicable to use, then secondary indications (where available) may be used to confirm that the associated circuit breaker has correctly opened (e.g. through a low volts alarm).
The ECO should draft and use a switching schedule to identify the actions being taken to disconnect the equipment and validate the associated secondary indications.
This shall be done before issuing the Form B permission to test and apply earths.
The test before earth and earthing of the equipment is the final confirmation that the equipment is disconnected from the supply and protected against re-energisation.
Investigation of Trips
In the event of any mal-discrimination of the protection system (i.e. Circuit Breakers which are not normally associated with a section or area are seen to operate) and where ABB FSKII circuit breakers may be a contributory cause (i.e. by failure to open) a fault shall be raised against the associated FSKII circuit breaker and it shall be investigated to confirm that the vacuum bottle is correctly operating.