Date | Name | Division | Registration Number | Vehicle Milage | Acknowlegement | Comments |
---|---|---|---|---|---|---|
January 29, 2021 | [454] | DL70AZF | 909 | I confirm that all the checks have been carried out and all defects found have been reported | ||
January 29, 2021 | [454] | DX69 ZGO | 18386 | I confirm that all the checks have been carried out and all defects found have been reported | ||
January 29, 2021 | [454] | DX69 ZGO | 18386 | I confirm that all the checks have been carried out and all defects found have been reported | ||
January 29, 2021 | [454] | DN70 DZU | 1508 | I confirm that all the checks have been carried out and all defects found have been reported | ||
February 5, 2021 | [454] | DN70 DZU | 2345 | I confirm that all the checks have been carried out and all defects found have been reported | ||
February 5, 2021 | [454] | DL70 DFF | 650 | I confirm that all the checks have been carried out and all defects found have been reported | ||
February 7, 2021 | [454] | DL70AZF | 1639 | I confirm that all the checks have been carried out and all defects found have been reported | ||
February 12, 2021 | [454] | DN70 DZU | 2635 | I confirm that all the checks have been carried out and all defects found have been reported | ||
February 14, 2021 | [454] | Dl70azf | 2015 | I confirm that all the checks have been carried out and all defects found have been reported | ||
February 17, 2021 | [454] | DL70 DFF | 1277 | I confirm that all the checks have been carried out and all defects found have been reported | ||
February 19, 2021 | [454] | Isolations Team | DN70 DZU | 3467 | I confirm that all the checks have been carried out and all defects found have been reported | |
February 21, 2021 | [454] | Isolations Team | DL70 AZF | 2681 | I confirm that all the checks have been carried out and all defects found have been reported | |
February 26, 2021 | [454] | De Vegetation Team | DX69 ZGO | 20450 | I confirm that all the checks have been carried out and all defects found have been reported |
None |
February 26, 2021 | [454] | OHL Contruction Team | Dl70 kyh | 702 | I confirm that all the checks have been carried out and all defects found have been reported | |
February 26, 2021 | [454] | OHL Contruction Team | Du70jdk | 5536 | I confirm that all the checks have been carried out and all defects found have been reported | |
February 26, 2021 | [454] | Support Services | DL70NLY | 000000 | I confirm that all the checks have been carried out and all defects found have been reported | |
February 26, 2021 | [454] | Isolations Team | DN70 DZU | 3791 | I confirm that all the checks have been carried out and all defects found have been reported | |
February 28, 2021 | [454] | Isolations Team | DL70AZF | 2955 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 5, 2021 | [454] | Isolations Team | MM70 MYS | 1197 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 5, 2021 | [454] | Plant & Transport Team | DX69 ZGO | 20980 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 5, 2021 | [454] | Plant & Transport Team | DV67VSN | 68666 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 5, 2021 | [454] | OHL Contruction Team | DL70KYH | 1090 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 5, 2021 | [454] | Isolations Team | Ds70 hln | 2567 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 6, 2021 | [454] | Isolations Team | DL20 EHE | 4475 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 5, 2021 | [454] | OHL Contruction Team | DL70KYH | 1090 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 5, 2021 | [454] | Isolations Team | DN70 DZU | 4329 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 7, 2021 | [454] | Isolations Team | DL70AZF | 3314 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 6, 2021 | [454] | Isolations Team | G8rny | 366 | I confirm that all the checks have been carried out and all defects found have been reported |
Crack in windscreen |
March 8, 2021 | [454] | Isolations Team | DN68FGG | 18752 | I confirm that all the checks have been carried out and all defects found have been reported |
N/A |
March 8, 2021 | [454] | Isolations Team | Ds70hwn | 12820 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 10, 2021 | [454] | Plant & Transport Team | DN69OGZ | 39200 | I confirm that all the checks have been carried out and all defects found have been reported |
Windscreen Damaged on M6 10.03.21 Stone Damage |
March 10, 2021 | [454] | Plant & Transport Team | DV67VSN | 69049 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 10, 2021 | [454] | Welding Team | DU20AUP | 39805 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 12, 2021 | [454] | Welding Team | DU20AUP | 31402 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 12, 2021 | [454] | Isolations Team | Ds70 hln | 2712 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 12, 2021 | [454] | Isolations Team | DL70 KVW | 1337 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 12, 2021 | [454] | Isolations Team | DN70 DZU | 5531 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 12, 2021 | [454] | Isolations Team | DL20 EHE | 4662 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 12, 2021 | [454] | OHL Contruction Team | DU21 FLB | 597 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 12, 2021 | [454] | Plant & Transport Team | DV67VSN | 69400 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 12, 2021 | [454] | OHL Contruction Team | Dn69 ogz | 40130 | I confirm that all the checks have been carried out and all defects found have been reported |
Damaged back door |
March 12, 2021 | [454] | OHL Contruction Team | Ds70 hkx | 10002 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 12, 2021 | [454] | Welding Team | Dv69xlz | 15457 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 12, 2021 | [454] | De Vegetation Team | DX69 ZGO | 21679 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 12, 2021 | [454] | Plant & Transport Team | Du70jdk | 6641 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 12, 2021 | [454] | Isolations Team | DS70HVH | 7153 | I confirm that all the checks have been carried out and all defects found have been reported |
Had a new tyre fitted following puncture last night. |
March 12, 2021 | [454] | Isolations Team | BT68 WYK | 00000 | I confirm that all the checks have been carried out and all defects found have been reported |
Needed a head light bulb so I’ve been abs bought one and will fit tomorrow |
March 12, 2021 | [454] | Isolations Team | Ds70hsg | 8000 | I confirm that all the checks have been carried out and all defects found have been reported |
Wiper blades are poor |
March 14, 2021 | [454] | Isolations Team | DL70AZF | 4086 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 14, 2021 | [454] | Isolations Team | DL70 DFF | 2466 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 12, 2021 | [454] | Isolations Team | Ds70hsg | 8000 | I confirm that all the checks have been carried out and all defects found have been reported |
Wiper blades are poor |
March 15, 2021 | [454] | Isolations Team | DN68FGG | 20292 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 12, 2021 | [454] | Isolations Team | Ds70hsg | 8000 | I confirm that all the checks have been carried out and all defects found have been reported |
Wiper blades are poor |
March 17, 2021 | [454] | Welding Team | DU20AUP | 31565 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 19, 2021 | [454] | OHL Contruction Team | Various | 0 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 19, 2021 | [454] | OHL Contruction Team | Various | 0 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 19, 2021 | [454] | Plant & Transport Team | DV67VSN | 69857 | I confirm that all the checks have been carried out and all defects found have been reported |
none |
March 19, 2021 | [454] | Isolations Team | Dn70dze | 9000 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 19, 2021 | [454] | Welding Team | Du70jdz | 46000 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 19, 2021 | [454] | Isolations Team | G8RNY | 2178 | I confirm that all the checks have been carried out and all defects found have been reported |
Crack in windscreen booked in for next week |
March 19, 2021 | [454] | Isolations Team | Dx69zft | 36000 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 19, 2021 | [454] | OHL Contruction Team | Du21flb | 1236 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 19, 2021 | [454] | Isolations Team | Ds70hwn | 13850 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 19, 2021 | [454] | Isolations Team | DL20 EHE | 4830 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 19, 2021 | [454] | Welding Team | DU20AUP | 32101 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 19, 2021 | [454] | Isolations Team | DS70 HUV | 10348 | I confirm that all the checks have been carried out and all defects found have been reported |
Spare wheel is punctured, but need to go to ats to get replaced. |
March 19, 2021 | [454] | OHL Contruction Team | Various | 0 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 19, 2021 | [454] | Isolations Team | DL70KXP | 1800 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 19, 2021 | [454] | Isolations Team | DL70KXP | 1800 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 12, 2021 | [454] | Isolations Team | Ds70 hln | 2906 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 12, 2021 | [454] | Isolations Team | Ds70 hln | 2906 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 19, 2021 | [454] | Isolations Team | DN70 DZU | 5909 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 19, 2021 | [454] | Plant & Transport Team | yg68nmz | 18000 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 19, 2021 | [454] | Isolations Team | ds70hsg | 8000 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 20, 2021 | [454] | Plant & Transport Team | Du70jdk | 7031 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 20, 2021 | [454] | OHL Contruction Team | Dn69ebc | 39500 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 21, 2021 | [454] | Isolations Team | DL70AZF | 4926 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 20, 2021 | [454] | OHL Contruction Team | Dn69ebc | 39500 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 6, 2021 | [454] | Welding Team | FN20 XDX | 12790 to 13566 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 13, 2021 | [454] | Welding Team | FN20 XDX | 13566 to 13962 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 26, 2021 | [454] | Plant & Transport Team | DV67VSN | 70180 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 26, 2021 | [454] | Welding Team | De367dr | 16775 | I was unable to carryout the checks | |
March 26, 2021 | [454] | Isolations Team | Dx69zft | 38483 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 26, 2021 | [454] | OHL Contruction Team | Dn69ebc | 40200 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 26, 2021 | [454] | Isolations Team | Ma21zze | 1641 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 19, 2021 | [454] | De Vegetation Team | DX69 ZGO | 22300 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 26, 2021 | [454] | De Vegetation Team | DX69 ZGO | 22600 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 26, 2021 | [454] | Isolations Team | DN70 DZU | 6570 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 26, 2021 | [454] | Plant & Transport Team | Du70jdk | 7459 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 26, 2021 | [454] | Isolations Team | DL20 EHE | 4960 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 26, 2021 | [454] | OHL Contruction Team | Du21flb | 1714 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 26, 2021 | [454] | Isolations Team | DN68FGG | 22444 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 26, 2021 | [454] | Welding Team | FN20 XDX | 13978 to 15599 | I confirm that all the checks have been carried out and all defects found have been reported |
No |
March 25, 2021 | [454] | Isolations Team | DS70 HUV | 11290 | I confirm that all the checks have been carried out and all defects found have been reported |
Small hole on bumper. |
March 27, 2021 | [454] | Isolations Team | Ds70 hln | 3100 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 27, 2021 | [454] | Isolations Team | DS70HVH | 9678 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 28, 2021 | [454] | Isolations Team | DL70AZF | 5176 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 28, 2021 | [454] | Isolations Team | DL70KXP | 2987 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 28, 2021 | [454] | Isolations Team | DL70KXP | 2987 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 29, 2021 | [454] | Isolations Team | G8RNY | 3000 | I confirm that all the checks have been carried out and all defects found have been reported |
Crack in windscreen |
April 1, 2021 | [454] | Plant & Transport Team | mj19yzn | 19972 | I confirm that all the checks have been carried out and all defects found have been reported |
Widescreen damaged when I took over the van from James. |
April 4, 2021 | [454] | Isolations Team | DL70AZF | 5860 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 5, 2021 | [454] | Isolations Team | DN68FGG | 24100 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 8, 2021 | [454] | Support Services | MJ19 YZN | 23847 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 8, 2021 | [454] | Support Services | YG68 NMZ | 34582 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 8, 2021 | [454] | Isolations Team | L24 ECS | 16279 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 9, 2021 | [454] | Isolations Team | BM68BSZ | 14,325 | I confirm that all the checks have been carried out and all defects found have been reported |
The lights have gone dead Dim apart from if full beam is on |
April 9, 2021 | [454] | Isolations Team | DN70 DZU | 7796 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 1, 2021 | [454] | Plant & Transport Team | DV67VSN | 70524 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 9, 2021 | [454] | Plant & Transport Team | DV67VSN | 70946 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 16, 2021 | [454] | Welding Team | Sn56knh | 147000 | I confirm that all the checks have been carried out and all defects found have been reported |
Ok |
April 9, 2021 | [454] | OHL Contruction Team | DN69EBC | 43000 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 9, 2021 | [454] | Isolations Team | DL20 EHE | 5415 | I confirm that all the checks have been carried out and all defects found have been reported |
Scrape on offside sill Graham Carney aware |
April 9, 2021 | [454] | Isolations Team | DL70 KVW | 3015 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 9, 2021 | [454] | Isolations Team | DS70 HLN | 3206 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 9, 2021 | [454] | Isolations Team | Dn70dze | 11000 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 9, 2021 | [454] | Isolations Team | MA21ZZE | 2850 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 9, 2021 | [454] | Isolations Team | Ds70 huv | 12656 | I confirm that all the checks have been carried out and all defects found have been reported |
Small dent on front bumper |
April 9, 2021 | [454] | Isolations Team | BT68 WYK | 21230 | I confirm that all the checks have been carried out and all defects found have been reported |
Probably going to need a new wiper blade on the passager side wipers |
April 9, 2021 | [454] | OHL Contruction Team | DU21FLB | 3089 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 9, 2021 | [454] | OHL Contruction Team | DN68 TYE | 34847 | I confirm that all the checks have been carried out and all defects found have been reported |
Front NS Light not working |
April 9, 2021 | [454] | Support Services | SM54 NDX | 109,780 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 9, 2021 | [454] | Support Services | YG68 NMZ | 34582 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 9, 2021 | [454] | Welding Team | L24 ECS | 16279 | I confirm that all the checks have been carried out and all defects found have been reported |
Wiper Blades not very effective, FNS Tyre has slow puncture, |
April 9, 2021 | [454] | Support Services | Dl70NLY | 3250 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 8, 2021 | [454] | Support Services | DN68 TYE | 34847 | I confirm that all the checks have been carried out and all defects found have been reported |
TEST ENTRY with photo |
April 9, 2021 | [454] | Support Services | Dl70NLY | 3250 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 11, 2021 | [454] | Isolations Team | DN68FGG | 25706 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 12, 2021 | [454] | Welding Team | DU20AUP | 34359 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 12, 2021 | [454] | Isolations Team | DS70 HVH | 11267 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 12, 2021 | [454] | Isolations Team | G8RNY | 4217 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 12, 2021 | [454] | OHL Contruction Team | DL70 DFF | 3026 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 16, 2021 | [454] | Isolations Team | MA21ZZE | 3860 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 16, 2021 | [454] | Plant & Transport Team | DV67VSN | 71344 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 16, 2021 | [454] | Isolations Team | DL70 KVW | 3592 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 16, 2021 | [454] | Isolations Team | DX69ZFT | 41110 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 16, 2021 | [454] | OHL Contruction Team | DU21FLB | 3487 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 16, 2021 | [454] | Plant & Transport Team | Du70jdk | 8890 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 16, 2021 | [454] | Isolations Team | DN70 DZU | 8414 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 16, 2021 | [454] | OHL Contruction Team | DU21FLB | 3487 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 17, 2021 | [454] | OHL Contruction Team | YS17PXG | 100360 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 17, 2021 | [454] | Isolations Team | DL70KXP | 3666 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 17, 2021 | [454] | Isolations Team | DL20 EHE | 5030 | I confirm that all the checks have been carried out and all defects found have been reported |
Damage to offside sill Graham Carney aware |
April 18, 2021 | [454] | OHL Contruction Team | DL70 DFF | 3707 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 18, 2021 | [454] | Isolations Team | DN68FGG | 26457 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 18, 2021 | [454] | Isolations Team | Mm70pnx | 1000 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 18, 2021 | [454] | Isolations Team | Mm70pnx | 1000 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 20, 2021 | [454] | OHL Contruction Team | YS17PXG | 1003600 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 20, 2021 | [454] | Isolations Team | DS70 HVH | 11781 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 21, 2021 | [454] | Welding Team | DU20 AUP | 35471 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 22, 2021 | [454] | OHL Contruction Team | DN69EBC | 42000 | I confirm that all the checks have been carried out and all defects found have been reported |
Head light front driver’s side gone |
April 22, 2021 | [454] | Welding Team | FN20 XDX | 13978 to 15599 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 23, 2021 | [454] | Plant & Transport Team | Df67vsn | 72043 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 23, 2021 | [454] | Isolations Team | DL70KXP | 4117 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 24, 2021 | [454] | Welding Team | DU70JDZ | 8200 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 25, 2021 | [454] | OHL Contruction Team | DL70 DFF | 3991 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 25, 2021 | [454] | Isolations Team | DN70 DZU | 9147 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 30, 2021 | [454] | Plant & Transport Team | DF67VSN | 72845 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 30, 2021 | [454] | OHL Contruction Team | DN69EBC | 42500 | I confirm that all the checks have been carried out and all defects found have been reported |
Front head light |
April 30, 2021 | [454] | OHL Contruction Team | DU21FLE | 3783 | I confirm that all the checks have been carried out and all defects found have been reported |
Scratch on back NS barn door |
April 30, 2021 | [454] | Isolations Team | DN70 DZU | 9611 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 3, 2021 | [454] | Welding Team | Dv69xlz | 17000 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 4, 2021 | [454] | Isolations Team | DN68FGG | 29627 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 7, 2021 | [454] | Isolations Team | DS70 HUV | 15439 | I confirm that all the checks have been carried out and all defects found have been reported |
Spare tyre still not sorted |
May 7, 2021 | [454] | Isolations Team | DN70 DZU | 10222 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 14, 2021 | [454] | Isolations Team | MA21ZZE | 7005 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 14, 2021 | [454] | Isolations Team | DN68FGG | 31472 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 14, 2021 | [454] | Isolations Team | DN70 DZU | 11035 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 14, 2021 | [454] | Isolations Team | DL70KXP | 5143 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 21, 2021 | [454] | Isolations Team | MA21ZZE | 8250 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 21, 2021 | [454] | Isolations Team | DN70 DZU | 11753 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 21, 2021 | [454] | Plant & Transport Team | Df67vsn | 74989 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 26, 2021 | [454] | Isolations Team | DN68FGG | 33734 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 28, 2021 | [454] | Isolations Team | Ma21zze | 8889 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 28, 2021 | [454] | Isolations Team | DN70 DZU | 12431 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 31, 2021 | [454] | Isolations Team | DL70 KVW | 7203 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 4, 2021 | [454] | Isolations Team | DL70 KVW | 7560 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 4, 2021 | [454] | Isolations Team | MA21ZZE | 9300 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 4, 2021 | [454] | Isolations Team | DN70 DZU | 12869 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 7, 2021 | [454] | Isolations Team | DN68FGG | 34979 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 10, 2021 | [454] | Isolations Team | MA21ZZE | 10312 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 11, 2021 | [454] | Isolations Team | DN68FGG | 35975 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 11, 2021 | [454] | Isolations Team | DN70 DZU | 13298 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 18, 2021 | [454] | Isolations Team | MA21ZZE | 11298 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 11, 2021 | [454] | Plant & Transport Team | DF67VSN | 76812 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 18, 2021 | [454] | Isolations Team | DN70 DZU | 14489 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 23, 2021 | [454] | OHL Contruction Team | MJ20OHD | 10706.5 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 21, 2021 | [454] | Isolations Team | DN68FGG | 36857 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 24, 2021 | [454] | Isolations Team | DL70 KVW | 8715 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 25, 2021 | [454] | Isolations Team | DN70 DZU | 15568 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 24, 2021 | [454] | Plant & Transport Team | DF67VSN | 77646 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 27, 2021 | [454] | Isolations Team | MA21ZZE | 12150 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 29, 2021 | [454] | Isolations Team | DN68FGG | 37680 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 2, 2021 | [454] | Isolations Team | DN68FGG | 38471 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 2, 2021 | [454] | Isolations Team | DN70 DZU | 15849 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 3, 2021 | [454] | Plant & Transport Team | Df67vsn | 78176 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 9, 2021 | [454] | Isolations Team | MA21ZZE | 13980 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 9, 2021 | [454] | Isolations Team | DN68FGG | 40146 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 9, 2021 | [454] | Isolations Team | DN70 DZU | 16703 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 14, 2021 | [454] | Isolations Team | DL70KVW | 10035 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 16, 2021 | [454] | Isolations Team | DN70 DZU | 17089 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 19, 2021 | [454] | Isolations Team | MA21ZZE | 14750 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 16, 2021 | [454] | Plant & Transport Team | DF67VSN | 79572 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 22, 2021 | [454] | OHL Contruction Team | DN69OGZ | 42502 | I confirm that all the checks have been carried out and all defects found have been reported |
Both front tyres at twi level |
July 23, 2021 | [454] | Isolations Team | DN68FGG | 41817 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 23, 2021 | [454] | Isolations Team | MJ19 ZTR | 19800 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 23, 2021 | [454] | Isolations Team | MA21ZZE | 15120 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 25, 2021 | [454] | Plant & Transport Team | DF67VSN | 80289 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 30, 2021 | [454] | Isolations Team | DN68 FNA | 5812 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 30, 2021 | [454] | Isolations Team | DN70 DZU | 18301 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 31, 2021 | [454] | Isolations Team | DL70KVW | 11548 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 31, 2021 | [454] | Isolations Team | DL70KVW | 11548 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 31, 2021 | [454] | Isolations Team | MA21ZZE | 16227 | I confirm that all the checks have been carried out and all defects found have been reported | |
August 5, 2021 | [454] | OHL Contruction Team | MJ20OHD | 15483.4 | I confirm that all the checks have been carried out and all defects found have been reported | |
August 5, 2021 | [454] | Isolations Team | MA21ZZE | 16876 | I confirm that all the checks have been carried out and all defects found have been reported | |
August 6, 2021 | [454] | Isolations Team | DN70 DZU | 18896 | I confirm that all the checks have been carried out and all defects found have been reported | |
August 10, 2021 | [454] | Isolations Team | dn68fna | 7103 | I confirm that all the checks have been carried out and all defects found have been reported | |
August 13, 2021 | [454] | Isolations Team | DN70 DZU | 20083 | I confirm that all the checks have been carried out and all defects found have been reported | |
August 17, 2021 | [454] | Isolations Team | DX69ZFT | 53100 | I confirm that all the checks have been carried out and all defects found have been reported |
Tracking seems to be out |
August 20, 2021 | [454] | Isolations Team | DN68 FNA | 8114 | I confirm that all the checks have been carried out and all defects found have been reported | |
August 26, 2021 | [454] | Isolations Team | DL70KXP | 9830 | I confirm that all the checks have been carried out and all defects found have been reported | |
August 27, 2021 | [454] | Isolations Team | MJ19 ZTR | 22300 | I confirm that all the checks have been carried out and all defects found have been reported | |
August 27, 2021 | [454] | Isolations Team | DN70 DZU | 21798 | I confirm that all the checks have been carried out and all defects found have been reported | |
August 27, 2021 | [454] | OHL Contruction Team | MJ20OHD | 18085.9 | I confirm that all the checks have been carried out and all defects found have been reported | |
September 2, 2021 | [454] | Isolations Team | MJ19 ZTR | 22600 | I confirm that all the checks have been carried out and all defects found have been reported | |
September 3, 2021 | [454] | Isolations Team | DN70 DZU | 22837 | I confirm that all the checks have been carried out and all defects found have been reported | |
September 5, 2021 | [454] | Isolations Team | MA21ZZE | 20001 | I confirm that all the checks have been carried out and all defects found have been reported | |
September 8, 2021 | [454] | OHL Contruction Team | MJ20OHD | 19.334.7 | I confirm that all the checks have been carried out and all defects found have been reported | |
September 10, 2021 | [454] | Isolations Team | DN68FNA | 9072 | I confirm that all the checks have been carried out and all defects found have been reported | |
September 10, 2021 | [454] | Isolations Team | MA21ZZE | 20287 | I confirm that all the checks have been carried out and all defects found have been reported | |
September 10, 2021 | [454] | Isolations Team | DN70 DZU | 23557 | I confirm that all the checks have been carried out and all defects found have been reported | |
September 17, 2021 | [454] | Isolations Team | MA21ZZE | 21000 | I confirm that all the checks have been carried out and all defects found have been reported | |
September 17, 2021 | [454] | Isolations Team | DN70 DZU | 24314 | I confirm that all the checks have been carried out and all defects found have been reported | |
September 24, 2021 | [454] | Welding Team | DU70JDZ | 19917 | I confirm that all the checks have been carried out and all defects found have been reported | |
September 24, 2021 | [454] | Isolations Team | DN70 DZU | 25537 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 1, 2021 | [454] | Isolations Team | DL70KXP | 11401 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 1, 2021 | [454] | Isolations Team | DN70 DZU | 26206 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 8, 2021 | [454] | Isolations Team | MA21ZZE | 22880 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 8, 2021 | [454] | Isolations Team | DN70 DZU | 27175 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 8, 2021 | [454] | Welding Team | du70jdz | 21449 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 8, 2021 | [454] | Isolations Team | Dp21 kgo | 2000 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 15, 2021 | [454] | Isolations Team | DN70 DZU | 27885 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 29, 2021 | [454] | Isolations Team | DP21-KGO | 4003 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 22, 2021 | [454] | Isolations Team | DN70 DZU | 28766 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 22, 2021 | [454] | Support Services | MJ70HXM | 15013 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 23, 2021 | [454] | Support Services | MJ70HXM | 15193 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 24, 2021 | [454] | Support Services | MJ70HXM | 15229 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 27, 2021 | [454] | Isolations Team | MA21ZZE | 25000 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 29, 2021 | [454] | Isolations Team | DN68FNA | 13108 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 29, 2021 | [454] | Welding Team | DU70JDZ | 23673 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 29, 2021 | [454] | Isolations Team | DN70 DZU | 29973 | I confirm that all the checks have been carried out and all defects found have been reported | |
November 5, 2021 | [454] | Isolations Team | DN70 DZU | 30472 | I confirm that all the checks have been carried out and all defects found have been reported | |
November 12, 2021 | [454] | Isolations Team | DN70 DZU | 31555 | I confirm that all the checks have been carried out and all defects found have been reported | |
November 12, 2021 | [454] | Isolations Team | DP21 KGO | 5775 | I confirm that all the checks have been carried out and all defects found have been reported | |
November 19, 2021 | [454] | Isolations Team | DN70 DZU | 32145 | I confirm that all the checks have been carried out and all defects found have been reported | |
November 20, 2021 | [454] | Plant & Transport Team | DL70KXP | 15921 | I confirm that all the checks have been carried out and all defects found have been reported | |
November 26, 2021 | [454] | Isolations Team | DN70 DZU | 32956 | I confirm that all the checks have been carried out and all defects found have been reported | |
November 27, 2021 | [454] | Plant & Transport Team | MJ70HXM | 16686 | I confirm that all the checks have been carried out and all defects found have been reported | |
December 3, 2021 | [454] | Isolations Team | DN68FGG | 47760 | I confirm that all the checks have been carried out and all defects found have been reported | |
December 3, 2021 | [454] | Isolations Team | DN70 DZU | 33815 | I confirm that all the checks have been carried out and all defects found have been reported | |
December 9, 2021 | [454] | Isolations Team | MA21ZZE | 28950 | I confirm that all the checks have been carried out and all defects found have been reported | |
December 10, 2021 | [454] | OHL Contruction Team | DS70 HPF | 27750 | I confirm that all the checks have been carried out and all defects found have been reported |
Damage to rear bumper |
December 10, 2021 | [454] | Isolations Team | DN70 DZU | 34981 | I confirm that all the checks have been carried out and all defects found have been reported | |
December 14, 2021 | [454] | Welding Team | DU70JDZ | 26153 | I confirm that all the checks have been carried out and all defects found have been reported |
crack on windscreen |
December 14, 2021 | [454] | Isolations Team | DL70DFF | 15642 | I confirm that all the checks have been carried out and all defects found have been reported | |
December 14, 2021 | [454] | OHL Contruction Team | NL55OGT | 150K | I confirm that all the checks have been carried out and all defects found have been reported | |
December 14, 2021 | [454] | OHL Contruction Team | MJ20ODH | 28339 | I confirm that all the checks have been carried out and all defects found have been reported |
QUESTION Thanks |
December 14, 2021 | [454] | Plant & Transport Team | Du70jdk | 27820 | I confirm that all the checks have been carried out and all defects found have been reported | |
December 15, 2021 | [454] | Welding Team | MT69 XHF | 53025 | I confirm that all the checks have been carried out and all defects found have been reported | |
December 15, 2021 | [454] | Welding Team | MT69 XHF | 53025 | I confirm that all the checks have been carried out and all defects found have been reported | |
December 17, 2021 | [454] | Isolations Team | DN68FGG | 49824 | I confirm that all the checks have been carried out and all defects found have been reported | |
December 17, 2021 | [454] | Isolations Team | DP21 KGO | 8950 | I confirm that all the checks have been carried out and all defects found have been reported |
Front parking sensors not working (waiting for Toyota to call there is a delay on parts) |
December 17, 2021 | [454] | Isolations Team | DN70 DZU | 35648 | I confirm that all the checks have been carried out and all defects found have been reported | |
December 18, 2021 | [454] | Welding Team | ML21EZA | 9764 | I confirm that all the checks have been carried out and all defects found have been reported | |
December 20, 2021 | [454] | Isolations Team | MA21ZZE | 30360 | I confirm that all the checks have been carried out and all defects found have been reported | |
December 24, 2021 | [454] | Isolations Team | DN70 DZU | 36385 | I confirm that all the checks have been carried out and all defects found have been reported | |
December 31, 2021 | [454] | Welding Team | ML21 EZA | 10222 | I confirm that all the checks have been carried out and all defects found have been reported | |
December 31, 2021 | [454] | Isolations Team | DN70 DZU | 37079 | I confirm that all the checks have been carried out and all defects found have been reported | |
January 5, 2022 | [454] | Isolations Team | MA21ZZE | 32100 | I confirm that all the checks have been carried out and all defects found have been reported | |
January 7, 2022 | [454] | Isolations Team | DN70 DZU | 38161 | I confirm that all the checks have been carried out and all defects found have been reported | |
January 11, 2022 | [454] | Isolations Team | DN68FGG | 52527 | I confirm that all the checks have been carried out and all defects found have been reported | |
January 14, 2022 | [454] | Plant & Transport Team | Dv71phk | 800 | I confirm that all the checks have been carried out and all defects found have been reported | |
January 14, 2022 | [454] | Isolations Team | DV71PFN | 635 | I confirm that all the checks have been carried out and all defects found have been reported | |
January 14, 2022 | [454] | Isolations Team | MA21ZZE | 32900 | I confirm that all the checks have been carried out and all defects found have been reported | |
January 15, 2022 | [454] | Isolations Team | DN70 DZU | 38971 | I confirm that all the checks have been carried out and all defects found have been reported | |
January 17, 2022 | [454] | Isolations Team | MA21ZZE | 33100 | I confirm that all the checks have been carried out and all defects found have been reported | |
January 21, 2022 | [454] | OHL Contruction Team | DL70 KXP | 18838 | I confirm that all the checks have been carried out and all defects found have been reported | |
January 21, 2022 | [454] | Plant & Transport Team | SN71 YGO | 16216 | I confirm that all the checks have been carried out and all defects found have been reported |
Rear right side reflector missing. |
January 21, 2022 | [454] | Isolations Team | DN70 DZU | 39616 | I confirm that all the checks have been carried out and all defects found have been reported | |
January 22, 2022 | [454] | Isolations Team | DV71PFN | 900 | I confirm that all the checks have been carried out and all defects found have been reported | |
January 26, 2022 | [454] | Isolations Team | DP21KGO | 13014 | I confirm that all the checks have been carried out and all defects found have been reported |
Vehicle front parking sensors still not working awaiting Toyota to receive parts to fix Tracker system is faulty alarm going off all the time from 65mph then have to drop to 55mph for it to clear,this is extremely dangerous whilst traveling on motorways |
January 26, 2022 | [454] | Plant & Transport Team | DS70HPF | 29877 | I confirm that all the checks have been carried out and all defects found have been reported |
OSF HEADLAMP INOPERATIVE |
January 28, 2022 | [454] | Welding Team | ML21EZA | 12,248 | I confirm that all the checks have been carried out and all defects found have been reported | |
January 28, 2022 | [454] | Isolations Team | DN70 DZU | 39941 | I confirm that all the checks have been carried out and all defects found have been reported | |
January 28, 2022 | [454] | OHL Contruction Team | DL70 KXP | 19173 | I confirm that all the checks have been carried out and all defects found have been reported | |
January 29, 2022 | [454] | Isolations Team | DV71PFN | 1020 | I confirm that all the checks have been carried out and all defects found have been reported | |
February 3, 2022 | [454] | Isolations Team | MJ19 ZTR | 32889 | I confirm that all the checks have been carried out and all defects found have been reported |
Vehicle due service |
February 3, 2022 | [454] | Isolations Team | MA21ZZE | 34750 | I confirm that all the checks have been carried out and all defects found have been reported | |
February 4, 2022 | [454] | Isolations Team | DN70 DZU | 40727 | I confirm that all the checks have been carried out and all defects found have been reported | |
February 5, 2022 | [454] | Welding Team | ML21EZA | 12878 | I confirm that all the checks have been carried out and all defects found have been reported | |
February 6, 2022 | [454] | Isolations Team | DV71PFN | 1700 | I confirm that all the checks have been carried out and all defects found have been reported | |
February 7, 2022 | [454] | Plant & Transport Team | YG71UHO | 8752 | I confirm that all the checks have been carried out and all defects found have been reported | |
February 7, 2022 | [454] | OHL Contruction Team | MJ20 ODH | 32220.9 | I confirm that all the checks have been carried out and all defects found have been reported | |
February 7, 2022 | [454] | OHL Contruction Team | DL70 KXP | 19551 | I confirm that all the checks have been carried out and all defects found have been reported | |
February 11, 2022 | [454] | Welding Team | ML21EZA | 13,062 | I confirm that all the checks have been carried out and all defects found have been reported | |
February 11, 2022 | [454] | Isolations Team | DV71 PHK | 2524 | I confirm that all the checks have been carried out and all defects found have been reported | |
February 11, 2022 | [454] | Isolations Team | MJ19 ZTR | 33330 | I confirm that all the checks have been carried out and all defects found have been reported |
Service Due, called West Wallasey on 03/02/22 to book. Was told a technician would call within 3-4 weeks. |
February 11, 2022 | [454] | Welding Team | MT69 XHF | 56652 | I confirm that all the checks have been carried out and all defects found have been reported | |
February 13, 2022 | [454] | Isolations Team | DV71PFN | 1963 | I confirm that all the checks have been carried out and all defects found have been reported | |
February 14, 2022 | [454] | Plant & Transport Team | DN71EEB | 000322 | I confirm that all the checks have been carried out and all defects found have been reported | |
February 15, 2022 | [454] | OHL Contruction Team | MJ20 ODH | 32687 | I confirm that all the checks have been carried out and all defects found have been reported | |
February 18, 2022 | [454] | Welding Team | ML21EZA | 13,740 | I confirm that all the checks have been carried out and all defects found have been reported | |
February 19, 2022 | [454] | Isolations Team | DV71 PHK | 3327 | I confirm that all the checks have been carried out and all defects found have been reported | |
February 21, 2022 | [454] | Isolations Team | DP21KGO | 14718 | I confirm that all the checks have been carried out and all defects found have been reported |
Parking sensors front still not working awaiting Toyota to contact me when part comes in |
February 24, 2022 | [454] | OHL Contruction Team | MJ20ODH | 33490.8 | I confirm that all the checks have been carried out and all defects found have been reported | |
February 25, 2022 | [454] | Isolations Team | DV71 PHK | 4009 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 2, 2022 | [454] | Plant & Transport Team | DN71EDU | 551 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 3, 2022 | [454] | Isolations Team | DU71 ZTL | 5975 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 4, 2022 | [454] | Welding Team | Ml21EZA | 14.640 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 4, 2022 | [454] | Isolations Team | DN68 FGG | 58389 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 8, 2022 | [454] | Plant & Transport Team | DN71EEB | 1676 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 9, 2022 | [454] | Isolations Team | MA21ZZE | 38250 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 10, 2022 | [454] | Isolations Team | DV71PFN | 3606 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 11, 2022 | [454] | Welding Team | Ml21EZA | 15,098 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 15, 2022 | [454] | De Vegetation Team | Wx68wfca | 34920 | I confirm that all the checks have been carried out and all defects found have been reported |
Breaks squealing constantly. Light coming up on dash |
March 15, 2022 | [454] | Plant & Transport Team | DN71EEB | 2259 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 18, 2022 | [454] | OHL Contruction Team | MJ20ODH | 35283 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 18, 2022 | [454] | Welding Team | Ml21EZA | 15,964 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 21, 2022 | [454] | Isolations Team | MA21ZZE | 39050 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 22, 2022 | [454] | Plant & Transport Team | DN71EEB | 3275 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 25, 2022 | [454] | Welding Team | ML21EZA | 16 754 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 29, 2022 | [454] | De Vegetation Team | DN71EEB | 4137 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 29, 2022 | [454] | OHL Contruction Team | DV71PHK | 6180 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 30, 2022 | [454] | Isolations Team | DP21KGO | 18630 | I confirm that all the checks have been carried out and all defects found have been reported |
Small dent on rear drivers quarter look like car door. Only notice we washed van |
March 31, 2022 | [454] | Isolations Team | DV71PFN | 4700 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 1, 2022 | [454] | OHL Contruction Team | MJ20ODH | 36700 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 1, 2022 | [454] | Welding Team | Ml21EZA | 17606 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 4, 2022 | [454] | Plant & Transport Team | DN69EBC | 000 | I confirm that all the checks have been carried out and all defects found have been reported |
Service due light |
April 5, 2022 | [454] | OHL Contruction Team | DN69EBC | 69800 | I confirm that all the checks have been carried out and all defects found have been reported |
Engine management light on with sevice light add blue light saying 400 miles left and I filled it up in yard |
April 6, 2022 | [454] | Plant & Transport Team | DN71EEB | 4945 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 7, 2022 | [454] | Welding Team | Mj19yzy | 24290 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 8, 2022 | [454] | Welding Team | Ml21EZA | 17904 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 12, 2022 | [454] | Isolations Team | DN68FGG | 60451 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 14, 2022 | [454] | OHL Contruction Team | DS68 TAU | 43494 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 17, 2022 | [454] | Plant & Transport Team | MJ19LVM | See41399 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 21, 2022 | [454] | OHL Contruction Team | DS68TAU | 44874 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 22, 2022 | [454] | Welding Team | ML22llu | 789 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 25, 2022 | [454] | Isolations Team | DU71ZTL | 9900 | I confirm that all the checks have been carried out and all defects found have been reported |
Horn not working |
April 28, 2022 | [454] | OHL Contruction Team | DS68TAU | 45845 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 29, 2022 | [454] | Welding Team | ML22LLU | 1074 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 5, 2022 | [454] | OHL Contruction Team | DS68TAU | 46821 | I confirm that all the checks have been carried out and all defects found have been reported |
Large Crack to passenger side, Windscreen. West Wallasey Service dept informed this morning. Awaiting a call from National Windscreens to advise upon repair timetable . |
May 6, 2022 | [454] | Welding Team | ML21EZA | 18,082 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 6, 2022 | [454] | Plant & Transport Team | Du21flb | 46426 | I confirm that all the checks have been carried out and all defects found have been reported |
X2 stone chips in windscreen, x1 has stared, new windscreen required Dint in rear drivers wheel arch Scratches on rear doors Dint near fuel cap |
May 6, 2022 | [454] | Plant & Transport Team | Dp21hdh | 28058 | I confirm that all the checks have been carried out and all defects found have been reported |
Near side side panel damaged near fuel cap Small scratch on drivers door |
May 9, 2022 | [454] | Isolations Team | HV68FHL | 55689 | I confirm that all the checks have been carried out and all defects found have been reported |
Window wipers not working or won’t turn off. |
May 10, 2022 | [454] | Plant & Transport Team | DN69EBC | 66400 | I confirm that all the checks have been carried out and all defects found have been reported |
Wiper blades poor |
May 10, 2022 | [454] | Plant & Transport Team | DU70JDK | 37830 | I confirm that all the checks have been carried out and all defects found have been reported |
ABS Warning light on dash |
May 11, 2022 | [454] | Isolations Team | DU71ZTL | 11425 | I confirm that all the checks have been carried out and all defects found have been reported |
Vehicles horn doesn’t work |
May 12, 2022 | [454] | OHL Contruction Team | DS68TAU | 47935 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 12, 2022 | [454] | Plant & Transport Team | MJ19ZTR | 40192 | I confirm that all the checks have been carried out and all defects found have been reported |
Front tyres low tread , steering vibration at low speed |
May 13, 2022 | [454] | Welding Team | ML21EZA | 18420 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 17, 2022 | [454] | Welding Team | Ml22MSU | 1497 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 17, 2022 | [454] | Isolations Team | DL70DFF | 27240 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 18, 2022 | [454] | Isolations Team | DN69EBC | 66000 | I confirm that all the checks have been carried out and all defects found have been reported |
Engine management light on dash saying engine fault and a spanner sign also on dash |
May 19, 2022 | [454] | OHL Contruction Team | dl70dff | 27481 | I confirm that all the checks have been carried out and all defects found have been reported |
2 dents drivers aide rear and scratches inside back of van |
May 19, 2022 | [454] | OHL Contruction Team | MJ20ODH | 42198 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 19, 2022 | [454] | OHL Contruction Team | Ds70hwn | 49206 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 20, 2022 | [454] | OHL Contruction Team | DS68TAU | 49324 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 20, 2022 | [454] | Welding Team | Ml21EZA | 18976 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 20, 2022 | [454] | Plant & Transport Team | Ds70hkx | 54152 | I confirm that all the checks have been carried out and all defects found have been reported |
Needs x4 new tyres as all on limit. Van is dirty inside and out but no signs of damage |
May 21, 2022 | [454] | OHL Contruction Team | Ds70hwn | 49410 | I confirm that all the checks have been carried out and all defects found have been reported |
Arm rest missing on drivers seat. |
May 21, 2022 | [454] | Plant & Transport Team | DU70JDK | 38698 | I confirm that all the checks have been carried out and all defects found have been reported |
ABS Warning light on |
May 23, 2022 | [454] | OHL Contruction Team | MJ20ODH | 42509.7 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 25, 2022 | [454] | OHL Contruction Team | Ds70hwn | 49969 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 26, 2022 | [454] | OHL Contruction Team | DS68TAU | 50250 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 26, 2022 | [454] | OHL Contruction Team | DL70DFF | 27868 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 26, 2022 | [454] | Plant & Transport Team | DY71LXB | 16579 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 27, 2022 | [454] | Welding Team | ML21EZA | 19,472 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 30, 2022 | [454] | OHL Contruction Team | DS70HWN | 50587 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 31, 2022 | [454] | OHL Contruction Team | DS68TAU | 50468 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 31, 2022 | [454] | Plant & Transport Team | MJ19ZTR | 41066 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 31, 2022 | [454] | OHL Contruction Team | MJ20ODH | 43454.7 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 3, 2022 | [454] | Plant & Transport Team | DU70 JDZ | 35829 | I confirm that all the checks have been carried out and all defects found have been reported |
Damage to passengers rear side, plastic trim missing. Drivers side headlight out. Slight crack in drivers side reverse light. |
June 4, 2022 | [454] | Isolations Team | DU71ZTL | 13302 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 6, 2022 | [454] | Welding Team | Ml21EZA | 20,322 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 7, 2022 | [454] | OHL Contruction Team | DS70HWN | 51521 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 7, 2022 | [454] | OHL Contruction Team | MJ20ODH | 43987.6 | I confirm that all the checks have been carried out and all defects found have been reported |
Passenger side front bumper scratches and deformed bumper |
June 9, 2022 | [454] | OHL Contruction Team | DS68TAU | 51969 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 9, 2022 | [454] | Plant & Transport Team | MJ19ZTR | 41615 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 9, 2022 | [454] | Isolations Team | DP21KGO | 22175 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 10, 2022 | [454] | Welding Team | ML21EZA | 20,376 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 10, 2022 | [454] | OHL Contruction Team | MJ20ODH | 44485.0 | I confirm that all the checks have been carried out and all defects found have been reported |
Drive side door mirror smashed due to other van hitting it on the way to story Birmingham. |
June 12, 2022 | [454] | OHL Contruction Team | MT22 CZR | 447.2 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 12, 2022 | [454] | Plant & Transport Team | DU70 JDZ | 36541 | I confirm that all the checks have been carried out and all defects found have been reported |
Passenger side rear panel missing, some damage in same area. Reverse censor loose. |
June 16, 2022 | [454] | OHL Contruction Team | DS68TAU | 53039 | I confirm that all the checks have been carried out and all defects found have been reported |
Rear Doors out of alignment |
June 17, 2022 | [454] | Welding Team | ML21EZA | 20,618 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 23, 2022 | [454] | Plant & Transport Team | MJ19ZTR | 42623 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 23, 2022 | [454] | Isolations Team | ML21FFO | 2827 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 23, 2022 | [454] | OHL Contruction Team | Ds70hwn | 53674 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 23, 2022 | [454] | OHL Contruction Team | MT22CZR | 1788 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 23, 2022 | [454] | Plant & Transport Team | DV71 PFD | 15090 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 24, 2022 | [454] | Welding Team | ML21EZA | 21,486 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 24, 2022 | [454] | Isolations Team | MA21 ZZE | 44824 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 26, 2022 | [454] | OHL Contruction Team | DN71 BOH | 7275 | I confirm that all the checks have been carried out and all defects found have been reported |
Engine fault, company aware, appeared when tracker fitted |
June 27, 2022 | [454] | OHL Contruction Team | MT22CZR | 2114.0 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 28, 2022 | [454] | Isolations Team | ML21 FFO | 3030 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 29, 2022 | [454] | Isolations Team | DU71ZTL | 14977 | I confirm that all the checks have been carried out and all defects found have been reported |
Scratch on passenger side door. Not seen it till this check. |
June 30, 2022 | [454] | OHL Contruction Team | DV71PHK | 1520 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 30, 2022 | [454] | OHL Contruction Team | MT22CZR | 2388 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 1, 2022 | [454] | Isolations Team | MK70VJG | 24308 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 2, 2022 | [454] | Isolations Team | MA21 ZZE | 45256 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 2, 2022 | [454] | OHL Contruction Team | Dn71 boh | 7710 | I confirm that all the checks have been carried out and all defects found have been reported |
Engin fault, needs repair |
July 3, 2022 | [454] | Welding Team | ML21EZA | 22260 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 5, 2022 | [454] | OHL Contruction Team | MT22CZR | 2872 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 6, 2022 | [454] | Isolations Team | MK21FFO | 3670 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 7, 2022 | [454] | OHL Contruction Team | MT22CZR | 3045 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 7, 2022 | [454] | Plant & Transport Team | DU70 JDZ | 38060 | I confirm that all the checks have been carried out and all defects found have been reported |
Reverse sensor loose. |
July 8, 2022 | [454] | OHL Contruction Team | DP21UUW | 20183 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 9, 2022 | [454] | OHL Contruction Team | DN71 BOH | 8053 | I confirm that all the checks have been carried out and all defects found have been reported |
Engine fault |
July 12, 2022 | [454] | Support Services | DV71PHK | 16114 | I confirm that all the checks have been carried out and all defects found have been reported |
Vehicle Decals ‘peeling’ away |
July 15, 2022 | [454] | Welding Team | MT69 XHF | 65553 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 16, 2022 | [454] | Plant & Transport Team | DU70 JDZ | 38660 | I confirm that all the checks have been carried out and all defects found have been reported |
Damage to passenger side rear. |
July 16, 2022 | [454] | Isolations Team | MA21 ZZE | 46164 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 16, 2022 | [454] | Welding Team | ML21EZA | 22432 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 19, 2022 | [454] | Plant & Transport Team | MJ19ZTR | 44696 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 19, 2022 | [454] | Isolations Team | DU71ZTL | 16692 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 19, 2022 | [454] | Support Services | DV71 PHK | 16935 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 20, 2022 | [454] | Isolations Team | MA21 ZZE | 46610 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 21, 2022 | [454] | Welding Team | ML21EZA | 22586 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 23, 2022 | [454] | Plant & Transport Team | DN69EBC | 69738 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 25, 2022 | [454] | OHL Contruction Team | DN71 BOH | 9137 | I confirm that all the checks have been carried out and all defects found have been reported |
Engine fault |
July 26, 2022 | [454] | Plant & Transport Team | MJ19ZTR | 45131 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 26, 2022 | [454] | Plant & Transport Team | DU70 JDZ | 39121 | I confirm that all the checks have been carried out and all defects found have been reported |
Damage to rear passenger side panel. |
July 28, 2022 | [454] | OHL Contruction Team | DP21UUW | 22232 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 28, 2022 | [454] | Isolations Team | MA21 ZZE | 47006 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 29, 2022 | [454] | Welding Team | ML21EZA | 22 ,564 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 30, 2022 | [454] | OHL Contruction Team | DN71 BOH | 9523 | I confirm that all the checks have been carried out and all defects found have been reported |
Engine fault – requires repair |
August 2, 2022 | [454] | Welding Team | ML21 EZA | 23142 | I confirm that all the checks have been carried out and all defects found have been reported | |
August 2, 2022 | [454] | Plant & Transport Team | MJ19ZTR | 45701 | I confirm that all the checks have been carried out and all defects found have been reported | |
August 4, 2022 | [454] | Plant & Transport Team | DN69EBC | 30005 | I confirm that all the checks have been carried out and all defects found have been reported | |
August 5, 2022 | [454] | Isolations Team | MA21 ZZE | 47538 | I confirm that all the checks have been carried out and all defects found have been reported | |
August 6, 2022 | [454] | OHL Contruction Team | DN71 BOH | 9793 | I confirm that all the checks have been carried out and all defects found have been reported |
Engine fault- requires repair |
August 9, 2022 | [454] | Plant & Transport Team | MJ19ZTR | 46445 | I confirm that all the checks have been carried out and all defects found have been reported | |
August 11, 2022 | [454] | Welding Team | ML21 EZQ | 24153 | I confirm that all the checks have been carried out and all defects found have been reported | |
August 12, 2022 | [454] | Isolations Team | MA21 ZZE | 47922 | I confirm that all the checks have been carried out and all defects found have been reported | |
August 12, 2022 | [454] | Isolations Team | DU71ZTL | 18420 | I confirm that all the checks have been carried out and all defects found have been reported | |
August 13, 2022 | [454] | OHL Contruction Team | DN71 BOH | 10167 | I confirm that all the checks have been carried out and all defects found have been reported |
Engine fault, requires repair, van now cuts out when idling |
August 20, 2022 | [454] | OHL Contruction Team | DN71 BOH | 10769 | I confirm that all the checks have been carried out and all defects found have been reported |
Engine fault |
August 22, 2022 | [454] | OHL Contruction Team | DP21UUW | 24605 | I confirm that all the checks have been carried out and all defects found have been reported | |
August 22, 2022 | [454] | Isolations Team | MA21 ZZE | 48827 | I confirm that all the checks have been carried out and all defects found have been reported | |
August 25, 2022 | [454] | Plant & Transport Team | DU70 JDZ | 40360 | I confirm that all the checks have been carried out and all defects found have been reported |
Damage to passenger rear side panel. |
August 26, 2022 | [454] | OHL Contruction Team | DP21UUW | 25250 | I confirm that all the checks have been carried out and all defects found have been reported | |
August 30, 2022 | [454] | Isolations Team | MA21 ZZE | 49522 | I confirm that all the checks have been carried out and all defects found have been reported | |
September 1, 2022 | [454] | Plant & Transport Team | DN69EBC | 71225 | I confirm that all the checks have been carried out and all defects found have been reported | |
September 1, 2022 | [454] | Plant & Transport Team | MJ19ZTR | 48245 | I confirm that all the checks have been carried out and all defects found have been reported | |
September 3, 2022 | [454] | OHL Contruction Team | DN71 BOH | 11840 | I confirm that all the checks have been carried out and all defects found have been reported |
Engine fault requires repair |
September 10, 2022 | [454] | OHL Contruction Team | DN71 BOH | 12578 | I confirm that all the checks have been carried out and all defects found have been reported |
Engine fault requires repair |
September 11, 2022 | [454] | Isolations Team | DL70 ZTL | 20100 | I confirm that all the checks have been carried out and all defects found have been reported | |
September 13, 2022 | [454] | Plant & Transport Team | DL70 NLY | 23320 | I confirm that all the checks have been carried out and all defects found have been reported |
Chipped Windscreen Damaged wing mirror |
September 19, 2022 | [454] | Isolations Team | MA21ZZE | 50215 | I confirm that all the checks have been carried out and all defects found have been reported | |
September 20, 2022 | [454] | OHL Contruction Team | DN71 BOH | 12961 | I confirm that all the checks have been carried out and all defects found have been reported |
Engine fault |
September 24, 2022 | [454] | Isolations Team | MA21 ZZE | 50559 | I confirm that all the checks have been carried out and all defects found have been reported | |
September 27, 2022 | [454] | Isolations Team | HK19 OMT | 53819 | I confirm that all the checks have been carried out and all defects found have been reported |
Window wipers not fully cleaning screen |
September 29, 2022 | [454] | Isolations Team | ML21 FFO | 10368 | I confirm that all the checks have been carried out and all defects found have been reported | |
September 30, 2022 | [454] | Isolations Team | DU71ZTL | 21161 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 3, 2022 | [454] | Isolations Team | DP21HDH | 45900 | I confirm that all the checks have been carried out and all defects found have been reported |
Paint work |
October 3, 2022 | [454] | Isolations Team | MA21 ZZE | 51139 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 4, 2022 | [454] | OHL Contruction Team | DN71 BOH | 13852 | I confirm that all the checks have been carried out and all defects found have been reported |
Engine fault |
October 5, 2022 | [454] | Plant & Transport Team | DV71 PFD | 24078 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 5, 2022 | [454] | Plant & Transport Team | MJ19ZTR | 51198 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 6, 2022 | [454] | Plant & Transport Team | DS70HKX | 62219 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 6, 2022 | [454] | Plant & Transport Team | MT70JEO | 39629 | I confirm that all the checks have been carried out and all defects found have been reported |
Scratches passenger side. Full length of vehicle |
October 6, 2022 | [454] | Plant & Transport Team | DP21KGO | 31498 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 7, 2022 | [454] | Plant & Transport Team | Du21flb | 55160 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 9, 2022 | [454] | Isolations Team | MA21 ZZE | 51515 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 9, 2022 | [454] | Isolations Team | DU71ZTL | 21450 | I confirm that all the checks have been carried out and all defects found have been reported |
Service due booked for two weeks times |
October 10, 2022 | [454] | Plant & Transport Team | DN69EBC | 72402 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 11, 2022 | [454] | Isolations Team | Dp21hdh | 46178 | I confirm that all the checks have been carried out and all defects found have been reported |
Drivers side head light bulb isn’t working, I have replaced it but it has blown again |
October 16, 2022 | [454] | Isolations Team | DU71ZTL | 21510 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 15, 2022 | [454] | OHL Contruction Team | DU22cHV | 9101 | I confirm that all the checks have been carried out and all defects found have been reported |
Dent on near side front wig / door |
October 17, 2022 | [454] | OHL Contruction Team | DN71 BOH | 15130 | I confirm that all the checks have been carried out and all defects found have been reported |
Engine fault |
October 17, 2022 | [454] | Plant & Transport Team | DUU70JDK | 49034 | I confirm that all the checks have been carried out and all defects found have been reported |
ABS light on |
October 17, 2022 | [454] | Plant & Transport Team | DU70JDK | 49000 | I confirm that all the checks have been carried out and all defects found have been reported |
Cruise control not working |
October 17, 2022 | [454] | Isolations Team | MA21 ZZE | 52113 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 19, 2022 | [454] | Isolations Team | DU20 AUP | 61800 | I confirm that all the checks have been carried out and all defects found have been reported |
Vehicle needs servicing, |
October 22, 2022 | [454] | OHL Contruction Team | DN71 BOH | 15263 | I confirm that all the checks have been carried out and all defects found have been reported |
Dpf fault |
October 22, 2022 | [454] | OHL Contruction Team | DU22CHV | 9924 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 28, 2022 | [454] | OHL Contruction Team | DU22CHV | 10502 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 30, 2022 | [454] | Plant & Transport Team | Dp21hdh | 47700 | I confirm that all the checks have been carried out and all defects found have been reported |
Airbag light on dash |
November 2, 2022 | [454] | OHL Contruction Team | DL70DFF | 42536 | I confirm that all the checks have been carried out and all defects found have been reported |
2 front tyres on limit |
November 2, 2022 | [454] | Isolations Team | MA21 ZZE | 53123 | I confirm that all the checks have been carried out and all defects found have been reported | |
November 4, 2022 | [454] | Plant & Transport Team | MJ19ZTR | 54357 | I confirm that all the checks have been carried out and all defects found have been reported | |
November 7, 2022 | [454] | Plant & Transport Team | DU21FLB | 57232 | I confirm that all the checks have been carried out and all defects found have been reported | |
November 5, 2022 | [454] | OHL Contruction Team | DU22CHV | 11075 | I confirm that all the checks have been carried out and all defects found have been reported | |
November 12, 2022 | [454] | OHL Contruction Team | DU22CHV | 11586 | I confirm that all the checks have been carried out and all defects found have been reported | |
November 15, 2022 | [454] | Isolations Team | MA21 ZZE | 54009 | I confirm that all the checks have been carried out and all defects found have been reported | |
November 17, 2022 | [454] | Plant & Transport Team | DU71ztl | 24206 | I confirm that all the checks have been carried out and all defects found have been reported | |
November 19, 2022 | [454] | OHL Contruction Team | DU22CHV | 12151 | I confirm that all the checks have been carried out and all defects found have been reported | |
November 22, 2022 | [454] | Plant & Transport Team | DU70 JDZ | 46062 | I confirm that all the checks have been carried out and all defects found have been reported |
Damage to passenger side rear panel Coolant level low Handbrake seems bent, not as was previously |
November 23, 2022 | [454] | Isolations Team | MA21 ZZE | 54411 | I confirm that all the checks have been carried out and all defects found have been reported | |
November 26, 2022 | [454] | OHL Contruction Team | DU22CHV | 12986 | I confirm that all the checks have been carried out and all defects found have been reported | |
November 29, 2022 | [454] | Plant & Transport Team | DU70 JDZ | 46946 | I confirm that all the checks have been carried out and all defects found have been reported |
Damage to passenger side rear panel Engine oil needs changing |
December 3, 2022 | [454] | OHL Contruction Team | DU22CHV | 13493 | I confirm that all the checks have been carried out and all defects found have been reported | |
December 6, 2022 | [454] | Plant & Transport Team | DU70 JDZ | 47160 | I confirm that all the checks have been carried out and all defects found have been reported |
Engine oil needs to be changed |
December 10, 2022 | [454] | OHL Contruction Team | DU22CHV | 14389 | I confirm that all the checks have been carried out and all defects found have been reported | |
December 17, 2022 | [454] | Isolations Team | MA21 ZZE | 56113 | I confirm that all the checks have been carried out and all defects found have been reported |
New brake pads required In with Ford 23RD DECEMBER |
December 17, 2022 | [454] | OHL Contruction Team | DU22CHV | 15153 | I confirm that all the checks have been carried out and all defects found have been reported | |
December 24, 2022 | [454] | OHL Contruction Team | DU22CHV | 15794 | I confirm that all the checks have been carried out and all defects found have been reported | |
December 31, 2022 | [454] | Plant & Transport Team | DU71ZTL | 26143 | I confirm that all the checks have been carried out and all defects found have been reported | |
January 3, 2023 | [454] | Plant & Transport Team | DU70 JDZ | 49703 | I confirm that all the checks have been carried out and all defects found have been reported |
Front passenger side tyre needs replacing as soon as possible |
January 7, 2023 | [454] | OHL Contruction Team | DU22CHV | 16711 | I confirm that all the checks have been carried out and all defects found have been reported | |
January 10, 2023 | [454] | Plant & Transport Team | DDN71WLJ | 8341 | I confirm that all the checks have been carried out and all defects found have been reported |
Windscreen cracked |
January 10, 2023 | [454] | Plant & Transport Team | DU70JDK | 50932 | I confirm that all the checks have been carried out and all defects found have been reported | |
January 11, 2023 | [454] | OHL Contruction Team | Du21flb | 60591 | I confirm that all the checks have been carried out and all defects found have been reported |
Van is due a service 2k over due |
January 12, 2023 | [454] | Plant & Transport Team | DU71ZTL | 27121 | I confirm that all the checks have been carried out and all defects found have been reported |
Cracked lense n/s/r cluster |
January 14, 2023 | [454] | OHL Contruction Team | DU22CHV | 17357 | I confirm that all the checks have been carried out and all defects found have been reported | |
January 19, 2023 | [454] | OHL Contruction Team | DU21FLB | 61283 | I confirm that all the checks have been carried out and all defects found have been reported |
Needs a service |
January 21, 2023 | [454] | OHL Contruction Team | DU22CHV | 18073 | I confirm that all the checks have been carried out and all defects found have been reported | |
January 25, 2023 | [454] | Plant & Transport Team | DU71ZTL | 27391 | I confirm that all the checks have been carried out and all defects found have been reported |
Previously reported cracked n/s/r cluster lense cracked. No white light showing to the rear |
January 28, 2023 | [454] | Plant & Transport Team | FN20XDK | 59941 | I confirm that all the checks have been carried out and all defects found have been reported |
N/side main mirror cracked |
January 28, 2023 | [454] | OHL Contruction Team | DU22CHV | 18585 | I confirm that all the checks have been carried out and all defects found have been reported | |
February 1, 2023 | [454] | Plant & Transport Team | DU70JDK | 52852 | I confirm that all the checks have been carried out and all defects found have been reported |
Brakes binding |
February 1, 2023 | [454] | Isolations Team | DN71 WDU | 12980 | I confirm that all the checks have been carried out and all defects found have been reported |
Back panel of van broken when got it |
February 4, 2023 | [454] | OHL Contruction Team | DU22CHV | 19135 | I confirm that all the checks have been carried out and all defects found have been reported | |
February 6, 2023 | [454] | OHL Contruction Team | DP21UUW | 40840 | I confirm that all the checks have been carried out and all defects found have been reported |
Scratch to passenger side front bumper |
February 7, 2023 | [454] | Plant & Transport Team | ML22MSU | 24915 | I confirm that all the checks have been carried out and all defects found have been reported |
4 wing mirrors broken or missing |
February 9, 2023 | [454] | Plant & Transport Team | DN71 WLP | 6000 | I confirm that all the checks have been carried out and all defects found have been reported |
Crack in passenger side windowscreen |
February 11, 2023 | [454] | OHL Contruction Team | DU22CHV | 19758 | I confirm that all the checks have been carried out and all defects found have been reported | |
February 16, 2023 | [454] | Isolations Team | DN71 WLP | 12460 | I confirm that all the checks have been carried out and all defects found have been reported |
Wing mirror damaged and mark on the side of the van. |
February 18, 2023 | [454] | OHL Contruction Team | DU22CHV | 20236 | I confirm that all the checks have been carried out and all defects found have been reported | |
February 20, 2023 | [454] | Plant & Transport Team | DU71ZTL | 28172 | I confirm that all the checks have been carried out and all defects found have been reported | |
February 24, 2023 | [454] | Plant & Transport Team | DU70JDK | 54313 | I confirm that all the checks have been carried out and all defects found have been reported |
Handbrake no holding |
February 25, 2023 | [454] | OHL Contruction Team | DU22CHV | 20842 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 4, 2023 | [454] | OHL Contruction Team | DU22CHV | 21240 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 6, 2023 | [454] | OHL Contruction Team | DN71EEB | 34245 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 11, 2023 | [454] | OHL Contruction Team | DU22CHV | 22075 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 18, 2023 | [454] | OHL Contruction Team | DU22CHV | 22790 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 19, 2023 | [454] | Plant & Transport Team | DU71ZTL | 30724 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 24, 2023 | [454] | Plant & Transport Team | DU70JDK | 56149 | I confirm that all the checks have been carried out and all defects found have been reported |
Brakes binding |
March 25, 2023 | [454] | OHL Contruction Team | DU22CHV | 23480 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 1, 2023 | [454] | OHL Contruction Team | DU22CHV | 24140 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 12, 2023 | [454] | Plant & Transport Team | DU71ZTL | 32446 | I confirm that all the checks have been carried out and all defects found have been reported |
Both front tyre treads low 2mm 3mm respective wheel spinning at junctions in wet conditions |
April 1, 2023 | [454] | OHL Contruction Team | DU22CHV | 24140 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 8, 2023 | [454] | OHL Contruction Team | DU22CHV | 24318 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 15, 2023 | [454] | OHL Contruction Team | DU22CHV | 24525 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 8, 2023 | [454] | OHL Contruction Team | DU22CHV | 24318 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 22, 2023 | [454] | OHL Contruction Team | DU22CHV | 25199 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 2, 2023 | [454] | Plant & Transport Team | DU71ZTL | 33548 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 6, 2023 | [454] | OHL Contruction Team | DU22CHV | 25610 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 10, 2023 | [454] | Plant & Transport Team | DU71ZTL 33986 | 33986 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 12, 2023 | [454] | OHL Contruction Team | DN71 EEB | 41582 | I confirm that all the checks have been carried out and all defects found have been reported |
Tyres tread is low |
May 13, 2023 | [454] | OHL Contruction Team | DU22CHV | 26276 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 16, 2023 | [454] | Plant & Transport Team | DU70JDK | 60795 | I confirm that all the checks have been carried out and all defects found have been reported |
Handbrake not holding |
May 16, 2023 | [454] | Isolations Team | DV71LWJ | 35893 | I confirm that all the checks have been carried out and all defects found have been reported |
Windscreen wipes need replacing (will get done at Halfords) |
May 17, 2023 | [454] | Plant & Transport Team | DU71ZTL | 34642 | I confirm that all the checks have been carried out and all defects found have been reported |
Dipped beam not working |
May 19, 2023 | [454] | OHL Contruction Team | DN68 FAO | 59720 | I confirm that all the checks have been carried out and all defects found have been reported |
Just taken van. |
May 20, 2023 | [454] | OHL Contruction Team | Du22CHV | 26803 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 27, 2023 | [454] | OHL Contruction Team | DU22CHV | 27356 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 2, 2023 | [454] | OHL Contruction Team | DN71 EEB | 43426 | I confirm that all the checks have been carried out and all defects found have been reported |
Cracked window screen, stone hit screen on moterway when passing a HGV |
June 3, 2023 | [454] | OHL Contruction Team | DU22CHV | 27902 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 6, 2023 | [454] | Plant & Transport Team | DU71ZTL | 35666 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 10, 2023 | [454] | OHL Contruction Team | DU22CHV | 28379 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 16, 2023 | [454] | OHL Contruction Team | Dl70DFF | 51506 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 17, 2023 | [454] | OHL Contruction Team | Du22chv | 28837 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 21, 2023 | [454] | Plant & Transport Team | DU71ZTL | 36058 | I confirm that all the checks have been carried out and all defects found have been reported |
Front tyres both on 2mm |
June 24, 2023 | [454] | OHL Contruction Team | DU22CHV | 29997 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 1, 2023 | [454] | OHL Contruction Team | DU22CHV | 30725 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 7, 2023 | [454] | OHL Contruction Team | DN71EEB | 45668 | I confirm that all the checks have been carried out and all defects found have been reported |
Window screen still has crack still waiting for Autoglass to replace |
July 8, 2023 | [454] | OHL Contruction Team | DU22CHV | 31190 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 9, 2023 | [454] | Plant & Transport Team | DU70JDK | 66018 | I confirm that all the checks have been carried out and all defects found have been reported |
Handbrake not holding |
July 14, 2023 | [454] | OHL Contruction Team | DL70DFF | 53407 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 15, 2023 | [454] | OHL Contruction Team | DU22CHV | 31906 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 22, 2023 | [454] | OHL Contruction Team | DN71 EEB | 47545 | I confirm that all the checks have been carried out and all defects found have been reported |
Cracked window screen still waiting reply from Auto glass |
July 22, 2023 | [454] | OHL Contruction Team | DU22CHV | 32471 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 29, 2023 | [454] | OHL Contruction Team | DU22CHV | 33067 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 31, 2023 | [454] | OHL Contruction Team | DN71 EEB | 48740 | I confirm that all the checks have been carried out and all defects found have been reported |
Window Screen cracked, getting replaced today |
August 11, 2023 | [454] | OHL Contruction Team | DL 70dff | 54996 | I confirm that all the checks have been carried out and all defects found have been reported | |
August 12, 2023 | [454] | OHL Contruction Team | DU22CHV | 33612 | I confirm that all the checks have been carried out and all defects found have been reported | |
August 14, 2023 | [454] | Isolations Team | DY69XPH | 56287 | I confirm that all the checks have been carried out and all defects found have been reported |
Passenger side fog light loose in bumper. |
August 19, 2023 | [454] | OHL Contruction Team | DU22CHV | 34016 | I confirm that all the checks have been carried out and all defects found have been reported | |
August 22, 2023 | [454] | OHL Contruction Team | DN71 EEB | 50420 | I confirm that all the checks have been carried out and all defects found have been reported | |
September 10, 2023 | [454] | Plant & Transport Team | DP21HDH | 87756 | I confirm that all the checks have been carried out and all defects found have been reported |
Rear number plate light out |
September 14, 2023 | [454] | OHL Contruction Team | DN71 EEB | 052348 | I confirm that all the checks have been carried out and all defects found have been reported |
Rear tyres will require changing |
September 16, 2023 | [454] | OHL Contruction Team | DU22CHV | 35117 | I confirm that all the checks have been carried out and all defects found have been reported | |
September 23, 2023 | [454] | Plant & Transport Team | DP21KGO | 50152 | I confirm that all the checks have been carried out and all defects found have been reported |
ESP/ASR SYSTEM FAULT |
October 12, 2023 | [454] | Isolations Team | DV73EKL | 811 | I confirm that all the checks have been carried out and all defects found have been reported |
Mark on drivers side wheel arch |
October 25, 2023 | [454] | OHL Contruction Team | DT70 MXB | 59000 | I confirm that all the checks have been carried out and all defects found have been reported |
All tyres tread is below legal limit, service light is on |
November 3, 2023 | [454] | OHL Contruction Team | Dl70dff | 59960 | I confirm that all the checks have been carried out and all defects found have been reported |
Near side rear tyre on limit |
November 4, 2023 | [454] | Isolations Team | MA72 AZT | 12570 | I confirm that all the checks have been carried out and all defects found have been reported | |
November 7, 2023 | [454] | Plant & Transport Team | DU70JDK | 76578 | I confirm that all the checks have been carried out and all defects found have been reported |
Oil change due |
November 11, 2023 | [454] | OHL Contruction Team | DU22CHV | 39688 | I confirm that all the checks have been carried out and all defects found have been reported |
Near side rear door broken into, overnight 08/11/23 -09/11/23 reported to Paul Ashton 09/11/23 |
November 18, 2023 | [454] | OHL Contruction Team | DU22CHV | 40371 | I confirm that all the checks have been carried out and all defects found have been reported | |
November 24, 2023 | [454] | OHL Contruction Team | DN71 EEB | 59324 | I confirm that all the checks have been carried out and all defects found have been reported |
Will require new rear tyres |
December 1, 2023 | [454] | OHL Contruction Team | DL70DFF | 60708 | I confirm that all the checks have been carried out and all defects found have been reported | |
December 15, 2023 | [454] | OHL Contruction Team | DN71 EEB | 60649 | I confirm that all the checks have been carried out and all defects found have been reported | |
December 23, 2023 | [454] | OHL Contruction Team | DU22CHV | 42608 | I confirm that all the checks have been carried out and all defects found have been reported | |
December 29, 2023 | [454] | Plant & Transport Team | DU70JDK | 79320 | I confirm that all the checks have been carried out and all defects found have been reported | |
January 17, 2024 | [454] | OHL Contruction Team | DN71 EEB | 64499 | I confirm that all the checks have been carried out and all defects found have been reported | |
January 26, 2024 | [454] | Plant & Transport Team | DU70JDK | 81350 | I confirm that all the checks have been carried out and all defects found have been reported | |
January 26, 2024 | [454] | OHL Contruction Team | Dl70dff | 65192 | I confirm that all the checks have been carried out and all defects found have been reported | |
January 27, 2024 | [454] | OHL Contruction Team | DU22CHV | 44305 | I confirm that all the checks have been carried out and all defects found have been reported | |
February 3, 2024 | [454] | OHL Contruction Team | DU22CHV | 44778 | I confirm that all the checks have been carried out and all defects found have been reported |
Front tyres close to limit |
February 17, 2024 | [454] | OHL Contruction Team | DU22CHV | 45790 | I confirm that all the checks have been carried out and all defects found have been reported |
Front tyres on wear limit |
February 17, 2024 | [454] | OHL Contruction Team | DU22CHV | 45790 | I confirm that all the checks have been carried out and all defects found have been reported |
Front tyres on wear limit |
February 24, 2024 | [454] | OHL Contruction Team | DU22CHV | 46276 | I confirm that all the checks have been carried out and all defects found have been reported |
Front tyres on legal limit |
February 27, 2024 | [454] | Plant & Transport Team | DU70JDK | 84892 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 22, 2024 | [454] | OHL Contruction Team | DN71 EEB | 070600 | I confirm that all the checks have been carried out and all defects found have been reported | |
March 30, 2024 | [454] | OHL Contruction Team | DU22CHV | 48426 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 6, 2024 | [454] | OHL Contruction Team | DU22CHV | 48697 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 17, 2024 | [454] | OHL Contruction Team | DN71 EEB | 072995 | I confirm that all the checks have been carried out and all defects found have been reported | |
April 24, 2024 | [454] | Plant & Transport Team | DU70 JDK | 89354 | I confirm that all the checks have been carried out and all defects found have been reported |
Oil change light illuminated |
April 29, 2024 | [454] | Plant & Transport Team | DU70JDK | 89670 | I confirm that all the checks have been carried out and all defects found have been reported |
Oil change light due, on |
May 4, 2024 | [454] | Isolations Team | DV73 EKL | 13000 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 11, 2024 | [454] | Isolations Team | DV73EKL | 13733 | I confirm that all the checks have been carried out and all defects found have been reported | |
May 19, 2024 | [454] | Plant & Transport Team | MK70VJG | 74718 | I confirm that all the checks have been carried out and all defects found have been reported |
O/s/f door moulding fell of needs new clips |
May 25, 2024 | [454] | OHL Contruction Team | DU22CHV | 52143 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 1, 2024 | [454] | OHL Contruction Team | Du22chv | 52326 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 13, 2024 | [454] | OHL Contruction Team | DN71 EEB | 77481 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 22, 2024 | [454] | OHL Contruction Team | DU22CHV | 53511 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 29, 2024 | [454] | Plant & Transport Team | DL70LDY | 062879 | I confirm that all the checks have been carried out and all defects found have been reported | |
June 29, 2024 | [454] | OHL Contruction Team | DU22CHV | 54007 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 13, 2024 | [454] | OHL Contruction Team | DU22CHV | 55013 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 24, 2024 | [454] | Plant & Transport Team | MK70VJG | 81520 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 27, 2024 | [454] | OHL Contruction Team | DU22CHV | 55977 | I confirm that all the checks have been carried out and all defects found have been reported | |
July 29, 2024 | [454] | Plant & Transport Team | DV73FNO | 17640 | I confirm that all the checks have been carried out and all defects found have been reported |
Front windscreen cracked |
August 6, 2024 | [454] | Plant & Transport Team | DV73FNO | 18291 | I confirm that all the checks have been carried out and all defects found have been reported |
Windscreen cracked |
August 3, 2024 | [454] | OHL Contruction Team | DU22CHV | 56720 | I confirm that all the checks have been carried out and all defects found have been reported | |
September 6, 2024 | [454] | Plant & Transport Team | DL70 LDY | 69325 | I confirm that all the checks have been carried out and all defects found have been reported |
Windscreen Wipers require replacement |
September 28, 2024 | [454] | Plant & Transport Team | DV73FNO | 19727 | I confirm that all the checks have been carried out and all defects found have been reported |
Windscreen cracked top offside |
September 21, 2024 | [454] | OHL Contruction Team | DU22CHV | 59425 | I confirm that all the checks have been carried out and all defects found have been reported | |
October 5, 2024 | [454] | Plant & Transport Team | DU70JDK | 93680 | I confirm that all the checks have been carried out and all defects found have been reported |