(0010) POLICY/PROCEDURE BRIEFING – ORION PARK MANAGEMENT
The following Policies/Procedures are detailed within this briefing:
- Orion Park Management Procedure
Line Managers shall brief their team as soon as possible on the relevant information contained within these documents, as required.
Once briefed, all individuals shall then record read & understood receipt through the internal briefing process.
This procedure has been included into the ECS Integrated Management System.
The purpose of this procedure is to outline the effective use of Orion Park and to ensure that the control of materials and equipment conform to ECS’ policies and procedures.
The procedure details:
- Orion Park Site Induction.
- How ECS will carry out receiving goods.
- Booking in/out materials & equipment.
- Accident/incident investigation/control.
- Storing materials/equipment.
- PPE to be worn.
- Lifting Operations.
Further procedure details:
- Safe Work Instructions & Briefings.
- Emergency Arrangements (including Fire).
- Dispatching.
- Returns from site and returns to the supplier.
- The requirements for managing equipment/assets and maintaining equipment testing/calibration.
The procedure places responsibility on the Orion Park Warehouse Supervisor to adhere to this procedure and to maintain the day-to-day operations of the premises.
Further information can be found within this procedure and a copy shall be maintained within Orion Park for reference.